Building A Bridge

1PedBridgeBaseSmallPreliminary work has begun on the pedestrian bridge that will connect the Medical Arts Building with the hospital’s South Parking Garage. Shown in this recent photo is the base that will support the columns and in turn support the bridge. The three sections of the pre-fabricated bridge will be transported along U.S. 41 the evening of March 5, weather permitting. The following day, the bridge will be assembled and “hung” with a crane.

Leave a Reply

Your email address will not be published. Required fields are marked *


8 × two =

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>